Production scheduling for injection moulding

The next order needs more than an available machine. Its mould, released material and setup capacity must be ready too. Apex brings these restrictions into machine scheduling for defined production lots.

Order scheduling. Simple. Efficient.

Automate routine work. Optimize operations. Meet deadlines.

  • Decide faster.

    Compare scenarios. Work through chat. Make informed decisions.

  • Easy to adapt.

    Your goals and rules for machines, shifts and processes.

  • Keep your existing systems.

    An AI add-on for your planning. No system switch. Runs locally.

Today, the planner manually reconciles Excel and ERP or MES. With Apex, an AI agent prepares data from connected systems and creates planning alternatives. The planner sets priorities, reviews the result and releases the plan. The animation illustrates the workflow, not measured processing times.

Plan manually

With Apex

What your schedule needs to connect

Reserve moulds with machines

Model approved mould-machine combinations and shared equipment. The same mould cannot be occupied on two machines, even if their calendars would allow it.

Represent material changes

Use configured transitions for setup and cleaning work. Compare a material-family grouping with a due-date-driven order sequence under your actual changeover rules.

Connect downstream work

Include defined finishing, assembly or inspection steps. A machine finishing early is useful only if the remaining route supports the order deadline.

Compare a concrete planning decision

Illustrative scenario with synthetic data

Two synthetic orders share a mould but use different materials. A third has an earlier due date and needs the same setup team. Should the material sequence stay together or be interrupted?

  1. 01Material ready
  2. 02Mould setup
  3. 03Moulding
  4. 04Post-processing

What to compare

Compare delivery dates and configured changeover work for both sequences. Use released quantities and realistic durations to review the balance between delivery priorities and setup effort.

See scenario planning in Apex

Bring the data you already have

Start with agreed exports from Excel, ERP or MES. Map them to your production model before connecting recurring updates.

  • Released lots, cycle-based durations and eligible mould-machine pairs
  • Material availability, setup and cleaning rules, equipment calendars
  • Downstream work, delivery priorities and committed production windows
Explore data and integration

Configured for your operation

Special cavity balancing, co-products, drying constraints or uninterrupted-run requirements need a validated model or extension. Apex schedules the declared process; it does not set injection parameters or determine material quality.

Plan your implementation

Start with Apex

Run Apex locally with your own AI models; we can help with setup and integration. Or request hosting by Qunevo with a Custom license. Custom also supports local operation, with services tailored to your needs.

Request an initial conversation Compare self-service and Custom
BUILT WITH QUNEVO

Data integration.
Planning rules.
Implementation and training.

Cookies and privacy

Google Ads measurement loads only after your consent. Without consent, no Google measurement tags or requests are loaded.

Advertising measurement records email contact clicks, not sent messages or confirmed enquiries. We do not send email addresses or message contents to Google. Advertising personalisation is disabled.

Consent choices are stored on this device for 180 days. Google measurement cookies may store pseudonymous identifiers for up to two years. Google Ireland Limited provides these services and may process data in the USA. You can withdraw consent using Cookie settings; this stops measurement and removes accessible measurement cookies.

Language selection
The selected language travels in the page URL. No cookie or browser-storage entry is used for it.
Website assets
Fonts, styling and scripts are served with this website.
Interactive example
The example uses fictional data and runs in your browser. No planning data is sent to an AI provider or scheduling service.
External links & contact
Qunevo and GitHub links open in a new tab. Email links open your mail application. Those services have their own processing terms; nothing is loaded from them before you follow a link.
Connection data
Qunevo GmbH operates this website using Railway hosting. Connection data such as IP addresses are processed to deliver pages and operate the hosting service securely. Optional visitor measurement requires your consent.

Qunevo’s general privacy policy and Google’s privacy information are linked below.

Qunevo privacy policy (opens in a new tab)Railway hosting privacy information (opens in a new tab)Google privacy information