Production scheduling for drive and gearbox manufacturing

A gearbox can only be assembled when its required parts are ready. Production scheduling must connect parallel component routes with assembly and testing, across many variants and delivery dates.

Order scheduling. Simple. Efficient.

Automate routine work. Optimize operations. Meet deadlines.

  • Decide faster.

    Compare scenarios. Work through chat. Make informed decisions.

  • Easy to adapt.

    Your goals and rules for machines, shifts and processes.

  • Keep your existing systems.

    An AI add-on for your planning. No system switch. Runs locally.

Today, the planner manually reconciles Excel and ERP or MES. With Apex, an AI agent prepares data from connected systems and creates planning alternatives. The planner sets priorities, reviews the result and releases the plan. The animation illustrates the workflow, not measured processing times.

Plan manually

With Apex

What your schedule needs to connect

Synchronize component routes

Represent shafts, housings and gears through their operations and readiness dependencies. Schedule assembly against the required components as well as workstation availability.

Share specialist capacity

Gear cutting, grinding and testing compete across orders. Include eligible equipment and calendars so order sequencing reflects those shared constraints.

Compare delivery priorities

An urgent assembly can pull several component jobs forward. Compare the impact on other orders before changing priorities, including the load at final testing.

Compare a concrete planning decision

Illustrative scenario with synthetic data

In a synthetic gearbox order, the housing is ready but a shaft operation is delayed. Another order has a complete set of parts. Should assembly switch order, or should the shaft receive higher priority?

  1. 01Component machining
  2. 02Parts ready
  3. 03Assembly
  4. 04Final testing

What to compare

Compare both scenarios through final testing. Review which feasible sequence supports your delivery priorities and work-in-progress goals, rather than considering the start of assembly alone.

See scenario planning in Apex

Bring the data you already have

Start with agreed exports from Excel, ERP or MES. Map them to your production model before connecting recurring updates.

  • Component workplans and dependencies for each assembly variant
  • Part readiness, purchased-component availability and open operations
  • Machining, assembly and test resources with shifts and durations
Explore data and integration

Configured for your operation

Configure the model for your component and assembly structure. Special external-processing, batch or acceptance rules must be modelled and validated for your operation; this is not a preconfigured gearbox package.

Plan your implementation

Start with Apex

Run Apex locally with your own AI models; we can help with setup and integration. Or request hosting by Qunevo with a Custom license. Custom also supports local operation, with services tailored to your needs.

Request an initial conversation Compare self-service and Custom
BUILT WITH QUNEVO

Data integration.
Planning rules.
Implementation and training.

Cookies and privacy

Google Ads measurement loads only after your consent. Without consent, no Google measurement tags or requests are loaded.

Advertising measurement records email contact clicks, not sent messages or confirmed enquiries. We do not send email addresses or message contents to Google. Advertising personalisation is disabled.

Consent choices are stored on this device for 180 days. Google measurement cookies may store pseudonymous identifiers for up to two years. Google Ireland Limited provides these services and may process data in the USA. You can withdraw consent using Cookie settings; this stops measurement and removes accessible measurement cookies.

Language selection
The selected language travels in the page URL. No cookie or browser-storage entry is used for it.
Website assets
Fonts, styling and scripts are served with this website.
Interactive example
The example uses fictional data and runs in your browser. No planning data is sent to an AI provider or scheduling service.
External links & contact
Qunevo and GitHub links open in a new tab. Email links open your mail application. Those services have their own processing terms; nothing is loaded from them before you follow a link.
Connection data
Qunevo GmbH operates this website using Railway hosting. Connection data such as IP addresses are processed to deliver pages and operate the hosting service securely. Optional visitor measurement requires your consent.

Qunevo’s general privacy policy and Google’s privacy information are linked below.

Qunevo privacy policy (opens in a new tab)Railway hosting privacy information (opens in a new tab)Google privacy information