Order scheduling for control cabinet manufacturing
Cabinet orders combine purchased components with skilled assembly and wiring work. A missing part or an occupied test station can change the entire delivery sequence. Apex helps schedule these dependencies together.
Order scheduling. Simple. Efficient.
Automate routine work. Optimize operations. Meet deadlines.
Decide faster.
Compare scenarios. Work through chat. Make informed decisions.
Easy to adapt.
Your goals and rules for machines, shifts and processes.
Keep your existing systems.
An AI add-on for your planning. No system switch. Runs locally.
Today, the planner manually reconciles Excel and ERP or MES. With Apex, an AI agent prepares data from connected systems and creates planning alternatives. The planner sets priorities, reviews the result and releases the plan. The animation illustrates the workflow, not measured processing times.
With Apex
What your schedule needs to connect
Connect parts and operations
Model which components are needed for each operation. Some assembly work may start before final wiring; the workplan should express the actual release conditions.
Plan qualified capacity
Represent workstations and the people or skill resources needed for assembly, wiring and inspection. Avoid parallel commitments that require the same limited capacity.
Keep final testing connected
A cabinet is not complete when wiring ends. Include defined inspection operations so the delivery discussion uses the complete order route.
Compare a concrete planning decision
Illustrative scenario with synthetic data
A synthetic cabinet order is waiting for a drive component. Another has all its parts but would occupy the only suitable test station on the same day. Which work can move forward without a new conflict?
- 01Mechanical assembly
- 02Component mounting
- 03Wiring
- 04Testing
What to compare
Compare operation release dates and qualified capacity in two scenarios. Review the testing finish, not only the assembly start, before agreeing a new delivery date.
See scenario planning in ApexBring the data you already have
Start with agreed exports from Excel, ERP or MES. Map them to your production model before connecting recurring updates.
- Order-specific assembly and wiring workplans with realistic durations
- Purchased-component readiness and engineering release dates
- Qualified people, workstations and inspection appointments
Configured for your operation
Electrical engineering, safety checks and test documentation remain in your established processes. Apex uses their defined operations for scheduling; it does not certify cabinets or replace technical acceptance.
Plan your implementationStart with Apex
Run Apex locally with your own AI models; we can help with setup and integration. Or request hosting by Qunevo with a Custom license. Custom also supports local operation, with services tailored to your needs.
Request an initial conversation Compare self-service and Custom