Order scheduling for control cabinet manufacturing

Cabinet orders combine purchased components with skilled assembly and wiring work. A missing part or an occupied test station can change the entire delivery sequence. Apex helps schedule these dependencies together.

Order scheduling. Simple. Efficient.

Automate routine work. Optimize operations. Meet deadlines.

  • Decide faster.

    Compare scenarios. Work through chat. Make informed decisions.

  • Easy to adapt.

    Your goals and rules for machines, shifts and processes.

  • Keep your existing systems.

    An AI add-on for your planning. No system switch. Runs locally.

Today, the planner manually reconciles Excel and ERP or MES. With Apex, an AI agent prepares data from connected systems and creates planning alternatives. The planner sets priorities, reviews the result and releases the plan. The animation illustrates the workflow, not measured processing times.

Plan manually

With Apex

What your schedule needs to connect

Connect parts and operations

Model which components are needed for each operation. Some assembly work may start before final wiring; the workplan should express the actual release conditions.

Plan qualified capacity

Represent workstations and the people or skill resources needed for assembly, wiring and inspection. Avoid parallel commitments that require the same limited capacity.

Keep final testing connected

A cabinet is not complete when wiring ends. Include defined inspection operations so the delivery discussion uses the complete order route.

Compare a concrete planning decision

Illustrative scenario with synthetic data

A synthetic cabinet order is waiting for a drive component. Another has all its parts but would occupy the only suitable test station on the same day. Which work can move forward without a new conflict?

  1. 01Mechanical assembly
  2. 02Component mounting
  3. 03Wiring
  4. 04Testing

What to compare

Compare operation release dates and qualified capacity in two scenarios. Review the testing finish, not only the assembly start, before agreeing a new delivery date.

See scenario planning in Apex

Bring the data you already have

Start with agreed exports from Excel, ERP or MES. Map them to your production model before connecting recurring updates.

  • Order-specific assembly and wiring workplans with realistic durations
  • Purchased-component readiness and engineering release dates
  • Qualified people, workstations and inspection appointments
Explore data and integration

Configured for your operation

Electrical engineering, safety checks and test documentation remain in your established processes. Apex uses their defined operations for scheduling; it does not certify cabinets or replace technical acceptance.

Plan your implementation

Start with Apex

Run Apex locally with your own AI models; we can help with setup and integration. Or request hosting by Qunevo with a Custom license. Custom also supports local operation, with services tailored to your needs.

Request an initial conversation Compare self-service and Custom
BUILT WITH QUNEVO

Data integration.
Planning rules.
Implementation and training.

Cookies and privacy

Google Ads measurement loads only after your consent. Without consent, no Google measurement tags or requests are loaded.

Advertising measurement records email contact clicks, not sent messages or confirmed enquiries. We do not send email addresses or message contents to Google. Advertising personalisation is disabled.

Consent choices are stored on this device for 180 days. Google measurement cookies may store pseudonymous identifiers for up to two years. Google Ireland Limited provides these services and may process data in the USA. You can withdraw consent using Cookie settings; this stops measurement and removes accessible measurement cookies.

Language selection
The selected language travels in the page URL. No cookie or browser-storage entry is used for it.
Website assets
Fonts, styling and scripts are served with this website.
Interactive example
The example uses fictional data and runs in your browser. No planning data is sent to an AI provider or scheduling service.
External links & contact
Qunevo and GitHub links open in a new tab. Email links open your mail application. Those services have their own processing terms; nothing is loaded from them before you follow a link.
Connection data
Qunevo GmbH operates this website using Railway hosting. Connection data such as IP addresses are processed to deliver pages and operate the hosting service securely. Optional visitor measurement requires your consent.

Qunevo’s general privacy policy and Google’s privacy information are linked below.

Qunevo privacy policy (opens in a new tab)Railway hosting privacy information (opens in a new tab)Google privacy information